It has already been 7 weeks of integrated studio. During this
seventh project, we are formed into groups consisting of 9 people.
This project are focused on group works. This project are named
'Interlink' or in other name it is call a footbridge.
We are required to do the site analysis based on the given site, that is HBP
School itself. We are being given a two optional proposed site. The first site
was between E48 lecture hall and the studio and secondly, the gap between
HBP resources centre and the main office building.
Based on our own analysis, the first site seems to hace much more potential
compared to the other proposed site. Have a look at our analysis.
After we have fully analyse the site potential, we started to do design schematics.
Identifying what is crucial for a bridge to be the designed with the existing condition
are being our main elemental structure of work.
The design was derived from a digital pattern of a circuit board. Why'd we chose
circuit patterns?This is because we want to emphasize digital look to a condusive
environment. Creating a pattern of light along the pedestrian bridge to highlight the
the surrounding with a focal point.
Here's some of what our team has resulted after two weeks of effort.
The drawings are consist of plans,elevation and some conceptional ideas that
are included in the design.
Lastly,i would like to give a big clap to all my group members. Without our teamwork,
This project wouldnt be done.
This project wouldnt be done.
Thanks to all,group 9